 |
| |
| Part
i : tb
lab services: diagram 3 |
 |
PLAN
OF ACTION FOR LARGE VOLUME AEROSOL ACCIDENT
Procedure:
|
Evacuate
the room immediately, except for the person
who caused the accident |
|
|
Shut
off the air system (if appropriate). Seal the exhaust
and intake air ducts as quickly as possible (use
plastic garbage bags and seal with tape) |
|
|
Turn
the fogging machine on, exit the room and seal the
door with tape |
|
|
Let
the fogging machine dispense the entire volume
of disinfectant, allow the fog to settle and leave
the room undisturbed for at least two hours
|
|
|
Put
on protective clothing (including an industrial
mask) before re-entering the room |
|
|
Soak
the spill with appropriate disinfectant and
leave for 30 minutes |
|
|
Place
all broken tubes and clean-up material in an appropriate
container and discard by one of the waste
disposal options |
|
|
Mop
the floor and laboratory benches with appropriate
disinfectant |
|
|
|
|
|